JAWAHAR NAVODAYA VIDYALAYA,PAURI GARHWAL, UTTARAKHAND

(Ministry of HRD,Dept Of Education,Government of India)

CBSE Affiliation Number:3540011

Current Time :

  
 :  21-03-2019

Infrastructure

 

STATUS OF INFRASTRUCTURE IN JNV

 

i

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

: 14 ACRE

: NIL

: 06.04.2014

 

ii

Status of Boundary Wall

a.  Brick Wall

b.  Barbed wire fencing

: (Incomplete)

INCOMPLETE

INCOMPLETE

 

iii

Permanent buildings constructed

: (CBRI pattern)

 

iv

School building

: Complete

 

V

Dormitories

 

:  Boys 2 Nos.

   With Warden Residence 4 Nos.

 

   

 

:  Girls 1 Nos.

   With Warden Residence 2 Nos.

 

vi

Kitchen/dining Hall

No. of shifts required for all students  to take food

:  Complete, Area 50 × 50 M2

1 SHIFT

 

vii

Principal Residence

:  1 No.

 

viii

 

 

Staff Quarters

 

 

: Type III = 8 Nos.

  Type II = 4 Nos.

  Type I = 4 Nos.

  SP Sheds converted into Staff Qrs.: NIL Nos.

 

ix

M.P. Hall

: Not available

X

Workshop

: Not available

xi

Type of O.H. Tank

 

Its capacity

 

Present Status

: Shaft type

 

:  NIL liters

 

: Not satisfactory

xii

U.G. tank

 

Its capacity

 

Present Status

                                 :    01

 

                                 :  100000 liters

 

                                : Working satisfactory

xiii

 

D.G. Set

 

:  Available

:   25 KV

: Working

: Year of procurement 2016

xiv

                                    Sewage Pump

: NIL H.P.

xv

Water Pump

: NIL capacity

xvi

Electrification

                                            Electric connection

Sub Station building

Street lighting

Numbers of hrs. During day when power supply is available on an average.

NIL

:  Rural Feeder

                            :  Incomplete

    : 10 Nos. of Poles

                            : 20 hrs.

  

xvii

Playfields

400 meter track

40 x 30 meter basket ball court

40 x 30 meter volley ball court

 

: Not available (Under construction)

: Not available

: Not available

xviii

 

Water supply

Tube Well

Hand pump

Connection from PHED

: Yes

: Not working

: Not working

: NIL

xix

Rajiv Gandhi Smriti Van

:  Available

xx

Fire fighting arrangement

:  Working

xxi

Last date of cleaning of

a. Septic tank

b. Water tanks

 

: 25.06.2016

: 16.09.2018

xxii

Whether area around transformer is fenced

:    No

xxiii

Whether open wells, if any, are covered from top

:    No

xxiv

Works taken up under M&R fund during current year and last year:-

:3 LAC

3 LAC

Year

Name of work  (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

2017-2018

White Wash in Acad. Block/ Doors & Windows Repair / Electricty & Plumbering Work                         3.00 Lakh  

2018-2019

     

 

          

                             

                                         Details of vehicle provided to the Vidyalaya

(i)

   Whether vehicle is provided or not (Yes/No)

  YES (DONETED BY LOCAL M.L.A.)

(ii)

  Description to vehicle.

MARUTI ECO AMBULANCE

(iii)

  Model no and date of purchase.

2015

(iv)

  Present condition of the Vehicle.

SERVICIABLE

 

Notice
Other Links
Our Location